Deployment Map

The map below shows the locations where EnCurrent systems have been installed or plan to be installed. Click on any red marker on the map to see the name of the site. Further details of each location are listed further down this page, below the map.

Loading...

 

Site: Bonnybrook Wastewater Treatment Plant
Location: Calgary, AB
Project Size: 5 kW
Status: Demonstration System installed and removed.
Description: A 5 kW demonstration system was installed in the effluent outflow of Bonnybrook Wastwater Treatment Plant in January of 2006. The system ran for over 1000 hours and was removed prior to high water in the spring. The City of Calgary was happy with the operation of the system and a permanent 5 kW installation is planned for fall of 2009.
 
Site: Western Irrigation District
Location: Chestermere, AB
Project Size: 5 kW
Status: Installed and Removed
Description: A 5 kW demonstration system was installed in July of 2006. The system ran for over 1300 hours with good results.
 
Site: Pointe du Bois
Location: Pointe du Bois, MB
Project Size: 30 kW
Status: Operating
Description: A 5 kW system was installed in December of 2007 at Pointe du Bois Manitoba at a site operated by the University of Manitoba upstream of a Manitoba Hydro Generating Facility. The system operated through the winter by was removed prior to spring breakup. In June of 2008 the system was re-installed and along with a 25 kW unit.
 
Site: Ruby
Location: Ruby, AK
Project Size: 5 kW
Status: Operating
Description: A 5 kW system was installed in August of 2008. The system was removed for the winter and re-installed in the summer of 2009.
 
Site: Coffee Creek
Location: Coffee Creek, YT
Project Size: 10 kW
Status: Planning
Description: Great River Journey, a unique world-class geotour, is looking to have the electricity for their lodge at Coffee Creek to be supplied by a 10 kW EnCurrent Power Generation System anchored in the Yukon River.
 
Site: Canoe Pass
Location: Campbell River, BC
Project Size: 500 kW
Status: Approvals
Description: The Canoe Pass Tidal Energy Demonstration Project is scheduled to be the first tidal installation of an EnCurrent Power Generation System. New Energy is working closely with Canoe Pass Tidal Energy Corp. on this project which is partially funded by Sustainable Development Technology Canada.
 
Site: Cardinal
Location: Cardinal, ON
Project Size: 25 kW
Status: Approvals
Description: The Edwardsburgh-Cardinal Business Association is working to install an EnCurrent Power Generation System installed in the St. Lawrence River within the town of Cardinal. This project is currently making its way through the regulatory approval process.
 
Site: Fort Simpson
Location: Fort Simpson, NT
Project Size: 25 kW
Status: Approvals
Description: Northwest Territories Power Corporation is working to install an EnCurrent Power Generation System on the Mackenzie River to provide electricity to the micro-grid in Fort Simpson.
 
Site: N’Dulee Ferry Crossing
Location: N’Dulee, NT
Project Size: 5 kW
Status: Approvals
Description: The Government of the Northwest Territories and Aurora College are working to install an EnCurrent Power Generation System on the Mackenzie River to provide electricity to the N’Dulee Ferry Crossing.