Duncan Dam, British Columbia
December 2008
The Duncan Dam project was the first pure sale of equipment to a customer. Four 25 kW systems were sold to Instream Energy Systems for performance testing and assessment of the interaction between multiple turbines in various orientations relative to each other. The systems were installed in a flow control channel downstream of the Duncan Dam.



